PNC Bank

PNC Bank St. Charles. New Parking Lot. Mill surface, haul away debris and install new hot mix asphalt @ 425 tons. New concrete handicap stalls, Layout and stripe. This project was performed during normal business hours. Thanks to PNC Bank and the crew for another fine paving construction project. Well very well done.

pnca

pncb

Remove and Replace Existing Asphalt Pavement
Remove Pavement: Remove existing asphalt pavement and haul away the excess debris. Install base stone as needed, adjust and set final grade and compact the base.

Install Pavement: Hot mix asphalt will be installed at various depths depending on the asphalt project requirements. A new asphalt driveway is typically 2″ compacted, while a parking lot varies from 3″ to 6″ depending on the requirements of the project and the expected application of the surface. The final grade is adjusted and the asphalt pavement is compacted.

Why use asphalt instead of concrete ?

Asphalt is less expensive at nearly half the cost of concrete
Asphalt is more durable; less subject to freeze and thaw cycles
Asphalt has a smooth consistent surface
Asphalt helps melt snow and ice in winter months
Asphalt is made of many recyclable materials

Commercial Asphalt Paving
We’re the asphalt driveway and asphalt parking lot experts. We handle the entire asphalt project from start to finish so the work gets done quickly and with consistent quality.

Excavating, site work & grading
New asphalt driveways
Replacement asphalt driveways
New blacktop driveways
Replacement blacktop driveways
Asphalt driveway patching
Asphalt overlays for existing pavement
Blacktop overlays for existing pavement